SAHAJWAYTechnologies Pvt. Ltd.
Enterprise · Operations

Foundry software for Rajkot: heat-number traceability, PPAP and SPC records your auto customers will ask for

  • November 28, 2026
  • 9 min read

Short answer

A foundry supplying auto customers must trace each casting back to its heat number, with that heat's chemistry and test results, and forward to the machining lot and invoice. It also needs SPC charts on key characteristics and PPAP files on request. Software links these records so one search answers an audit, and it can work alongside Tally.

Rajkot is one of Gujarat's main engineering centres, with foundries making grey and ductile iron castings for pumps, auto parts, solar structures and pipe fittings, and more of them now export fully machined castings. Moving from local grey-iron work to supplying auto Tier-1 and Tier-2 companies brings a new kind of customer question: which heat did this part come from, what was its chemistry, where is the SPC chart for this dimension, and where is the PPAP file? Paper registers and Tally can't answer those in minutes. This guide covers what auto customers expect under IATF 16949, the traceability chain from furnace to dispatch, what to record at each step, and when to add a quality layer to Tally instead of buying a full foundry ERP. We don't certify anyone; your certification body and customers decide what is enough.

What auto customers ask of a foundry

IATF 16949 is the quality management standard for the automotive supply chain, built on ISO 9001 with automotive additions. On top of it, each OEM issues its own customer-specific requirements. For a foundry, three demands come up again and again:

  • Traceability: identify each casting or lot so that, if a part fails, you can find every other part from the same heat, mould batch and machining lot, and tell the customer which shipments are affected.
  • SPC: statistical process control on the key characteristics marked in the drawing or control plan, with the charts and capability figures the customer can review.
  • PPAP: the production part approval process, where you submit evidence that your process makes the part to specification before regular supply starts, and resubmit when the process changes.

The standard asks for these outcomes, not for any particular software. But once a foundry ships thousands of castings a month to several customers, keeping the links on paper becomes the bottleneck at every audit and every complaint.

The traceability chain, furnace to invoice

  1. 1Heat: each melt gets a heat number, with charge mix, spectro chemistry and temperatures.
  2. 2Pour: which ladle and which moulds or boxes were poured from that heat, and at what time.
  3. 3Casting batch: knock-out, shot blasting and fettling, with counts of good and rejected castings.
  4. 4Testing: hardness, tensile and microstructure results linked to the heat or to test bars from it.
  5. 5Machining lot: castings issued to in-house or job-work machining, with the lot number carried forward.
  6. 6Inspection and packing: final inspection results, packing label with part, lot and heat.
  7. 7Dispatch: the invoice and delivery challan list the lots shipped to each customer.

If any link is missing, a single customer complaint can mean quarantining a whole month's stock because you can't prove which parts are safe.

What to record at each step

Traceability records in a foundry and who enters them
MeltingHeat number, charge mix, spectro result, tap temperatureMelting supervisor; spectro report imported or entered on a tablet
PouringHeat to moulds or boxes, pour time, pouring temperaturePouring operator; scan mould tags or enter box range
FettlingBatch, good count, rejections by defect typeFettling supervisor; tablet or shop-floor terminal
Lab testingHardness, tensile, microstructure per heatLab; results linked to the heat, certificate generated
MachiningLot number, castings issued, measured key dimensionsMachining supervisor or job worker; mobile app
Final inspectionInspection results, packing labelQuality inspector; label printed with lot and heat
DispatchLots per invoice and customerDispatch clerk; scan labels at loading

The rule is to capture data where it is created, by the person who creates it, ideally with a scan rather than typing. A mobile app on a rugged tablet works on most foundry floors; a shared desktop at the end of the shift does not.

Heat chemistry and test certificates

Most foundries already have the spectro printout and the lab register. The gap is the link. When the spectro result and the hardness and tensile results are stored against the heat number, the system can produce a test certificate for any dispatch in seconds, flag a heat that is out of the customer's chemistry range before its castings move on, and show trends in silicon, carbon equivalent or nodularity across heats.

SPC on key characteristics

Auto customers mark special or key characteristics on their drawings: a bore diameter, a wall thickness, a hardness range. For each one they expect regular measurement, control charts and capability figures (Cp and Cpk). Doing this on paper means someone copies readings into Excel at month-end. Recording measurements on the machining or inspection floor lets the charts update as readings come in, and warns the supervisor when a process drifts, before parts go out of tolerance.

PPAP packs from data you already have

A PPAP submission typically includes the design record, process flow diagram, PFMEA, control plan, measurement system analysis, dimensional results, material and performance test results, initial process studies and the part submission warrant. Several of these come straight from records you already keep: dimensional results from inspection, material results from the heat and lab records, initial process studies from SPC data. Software that holds those records can assemble the evidence for a part in minutes. The engineering documents (PFMEA, control plan) still need your quality team; software stores and versions them.

Tally plus a quality layer, foundry ERP, or custom

Ways to add traceability and quality records
Tally plus a traceability and quality layerAccounts, GST and invoicing work in Tally; quality records are the gapSync dispatches and lots to Tally invoices so the chain stays linked
Foundry ERPYou are replacing accounts, production planning and quality togetherBigger project; check heat-to-part traceability and PPAP output in the demo
Generic QMS or SPC toolYou need SPC charts or document control onlyUsually doesn't know heats, moulds or job-work lots

For many Rajkot foundries the strongest first step is narrow: heat records, pour-to-batch links, lot labels, test certificates and dispatch scans, with Tally keeping the accounts. SPC and PPAP packs come next, using the same data. Our ERP development team builds that layer or a fuller system. For the audit-trail side of quality records, see audit trail software for batch release; for production planning in made-to-order plants, see ERP for custom manufacturing; and for export paperwork on machined castings, see export documentation software in India.

Five checks against how you work today

  1. 1Pick one casting shipped last month. How long does it take to find its heat number, chemistry and hardness result?
  2. 2If one heat turns out bad, can you list every customer and invoice that received parts from it?
  3. 3Are SPC charts updated as parts are measured, or copied into Excel later?
  4. 4How long did your last PPAP submission take to assemble?
  5. 5Do job-work machining lots keep the heat or lot number, or is it lost when castings leave the foundry?

Common questions

What is heat-number traceability?

Linking every casting to the melt (heat) it was poured from, so its chemistry and test results can be found, and so all parts from a suspect heat can be located and contained.

Does IATF 16949 require software?

No. It requires traceability, process control and records, not a specific tool. Software becomes practical once volume and the number of customers make paper links slow and error-prone.

What is in a PPAP submission?

Evidence that your process makes the part to specification: design records, process flow, PFMEA, control plan, measurement system analysis, dimensional and material results, initial process studies and a part submission warrant. The customer decides which level of submission it needs.

Can we keep Tally?

Yes. A traceability and quality layer can own heats, lots and test records, and post dispatches and invoices to Tally, so accounts and GST stay where they are.

Next step

Planning something like this?

Tell us what you are working on. A few lines is enough: what the software needs to do, who uses it, and anything that is already in place.

  • A reply from an engineer within one business day.
  • Straight answers on approach, rough scale and timeline.
  • No follow-up sequence you did not ask for.

Rather pick a time? Book a demo. Need a price? Get a quote.

Sources

  1. 1.IATF 16949:2016 and sanctioned interpretations, International Automotive Task Force. Supports: what IATF 16949 is and its relationship to ISO 9001 and customer-specific requirements.
  2. 2.Quality core tools: APQP, control plan, PPAP, FMEA, MSA and SPC, Automotive Industry Action Group (AIAG). Supports: the purpose of PPAP and the elements of a submission.
  3. 3.Rajkot & Morbi: engineering global markets, Maritime Gateway. Supports: Rajkot's engineering and foundry base and its exports of machined castings.