SAHAJWAYTechnologies Pvt. Ltd.
Migration

Cloud migration services without a bad weekend

Assessment, planning, and staged migration from on-premise or legacy hosting — sequenced so each step is reversible and the business keeps running.

Cloud Migration
on-prem
database
file storage
app servers
batch jobs
cloud
cutover window agreedrollback rehearsedbusiness kept running

each step reversible · nothing moves twice

  • Infrastructure assessment
  • Migration strategy
  • Data migration
Best when
Ageing hardware, weak disaster recovery, or hosting that cannot scale.
Not a fit when
You expect the cloud to be automatically cheaper.
First thing you get
An inventory of what you run and a per-workload migration decision.

What is cloud migration?

Cloud migration is moving applications, data and infrastructure from on-premise servers or legacy hosting to a cloud platform. Each workload is rehosted, re-architected or left alone, depending on cost and benefit. We assess what you actually run, then sequence the move in stages so every step has a rollback and data integrity can be proven.

Cloud migration goes wrong in predictable ways: lifting an application unchanged and finding it costs more than the server it replaced, discovering an undocumented dependency during cutover, or moving data without a verified way to prove nothing was lost.

We work backwards from those failure modes. Assess what you actually run, decide per workload whether to rehost, re-architect, or leave it alone, and sequence the move so every step has a rollback and nothing depends on one perfect weekend.

01What we do

What this includes

everything below is in scope, not an upsell
  1. 01

    Infrastructure assessment

    What you actually run, what depends on what, and what nobody documented.

  2. 02

    Migration strategy

    A per-workload decision — rehost, re-platform, re-architect, or retire.

  3. 03

    Data migration

    Moving data with verification, so completeness is proven rather than assumed.

  4. 04

    Network and connectivity

    VPNs, private connectivity, and hybrid setups during the transition period.

  5. 05

    Staged cutover

    Workload by workload with a rollback path at every step.

  6. 06

    Post-migration tuning

    Right-sizing and cost optimisation once real usage patterns are visible.

02When this fits

Situations we see most often

Ageing on-premise hardware

Servers approaching end of life, with a capital purchase otherwise due.

You cannot scale when you need to

Fixed capacity that cannot absorb growth or seasonal demand.

Disaster recovery is a weak point

Backups that have never been restored and no tested recovery plan.

Your current hosting is the constraint

A provider or setup that blocks the tooling and automation you want to adopt.

03Before you commit

What to know before you start

Rehost, re-platform or re-architect: what is the difference?

Rehosting moves an application to the cloud largely unchanged, which is fast but rarely cheaper. Re-platforming makes targeted changes, such as moving a self-managed database to a managed one, for quick operational wins. Re-architecting changes how the application works to use cloud services fully, which costs more up front and delivers most of the long-term benefit.

We decide per workload. Some systems are best left where they are, and saying so is part of a proper assessment.

How is downtime avoided during migration?

By migrating in stages rather than in one weekend. Data is replicated to the new environment while the old one keeps running, traffic is shifted gradually, and every step has a tested rollback.

Most workloads move with brief, planned cutover windows, and some with none. We give you the expected window for each workload up front rather than promising zero downtime everywhere.

How do you prove no data was lost?

Data migration is treated as its own workstream. Before cutover we run trial migrations and reconcile counts, totals and checksums between source and target, and we keep rollback snapshots until the new environment has run cleanly.

The same checks run again at the final cutover, so the switch is backed by evidence rather than confidence.

What does the migration assessment produce?

An inventory of everything you run: applications, databases, scheduled jobs, file stores and the connections between them, including the undocumented ones. Each workload gets a recommendation to rehost, re-platform, re-architect or leave in place, with the reasoning and an estimated running cost in the cloud.

It also sets the order of migration, the expected downtime per workload, and the risks to watch. You own the assessment, whoever carries out the migration.

How is security handled in the new environment?

It is designed in, not carried over. Identity and access are set up with least privilege, networks are segmented, data is encrypted at rest and in transit, and secrets move into a secret manager. Infrastructure is defined as code, so the security configuration is reviewable and repeatable.

Migration is often the best moment to fix access problems that have built up over years in the old environment.

04Cost and timeline

What drives the cost of a cloud migration?

Migration cost depends on what you run today and how much each workload changes on the way. These factors move it most.

Number of workloadsHighEvery application, database and scheduled job needs assessing, planning and moving.
Migration approachHighRehosting is quickest; re-architecting costs more now and usually lowers running costs later.
Data volume and sensitivityHighLarge or regulated datasets need replication, verification and residency planning.
Undocumented dependenciesMediumHidden connections between systems found during assessment add work, and are far worse to find during cutover.
Downtime toleranceMediumNear-zero downtime needs replication and gradual traffic shifting rather than a simple cutover window.
Post-migration tuningLowRight-sizing and cost tuning after the move is quick work with a large effect on the monthly bill.
05How it runs

What a typical engagement looks like

  1. 011–3 weeks

    Discover

    Process map

  2. 022–4 weeks

    Design

    Interactive prototype

  3. 03two-week cycles

    Build

    Working software each cycle

  4. 04ongoing

    Ship & support

    Automated pipeline

The full process, with what you get at every stage
06Technology

What we build it with

Providers
AWSAzureGoogle Cloud
Method
RehostRe-platformRe-architect
Cutover
ReplicationStaged windowsRollback plan
07FAQ

Questions we get asked

asked on real calls, answered honestly
  1. 01Will migration cause downtime?

    Usually minimal, and planned. Most workloads migrate with brief cutover windows, and some with none using replication and traffic shifting. We tell you the expected window per workload up front rather than promising zero and discovering otherwise.

  2. 02Will the cloud be cheaper?

    Not automatically, and anyone promising it is guessing. Lift-and-shift often costs more than the hardware it replaced. Savings come from re-architecting to use managed services and scaling down when idle — which is why we model cost during planning.

  3. 03What about data residency requirements?

    All major providers offer Indian regions, and residency requirements are part of the planning input rather than an afterthought. Where regulation demands specific handling, we design to it explicitly.

  4. 04Can we migrate in phases?

    Yes, and we recommend it. Lower-risk workloads usually move first, so your team gains experience before the critical systems move.

  5. 05Do you migrate databases as well as applications?

    Yes, including moving self-managed databases to managed services where that makes sense, with verification at each stage.

  6. 06Can you help us choose a cloud provider?

    Yes. The assessment compares providers against your workloads, existing licences, team skills and data residency needs, rather than defaulting to one.

  7. 07What happens after the migration?

    Tuning and handover: right-sizing resources once real usage is visible, setting cost alerts, documenting the new environment, and optional ongoing operations support under a maintenance retainer.

  8. 08Do you migrate email and office systems?

    Our focus is applications, databases and the infrastructure behind them. For email and office suites we work alongside specialists, and make sure your applications keep working through the change.

08Related

Adjacent capabilities

Next step

Tell us what you are building.

Share the problem and we will come back with an approach, a rough shape of the work, and what it would take to deliver it.

Book a DemoGet a Quote