Short answer
Under revised Schedule M, a pharma plant's software must keep materials and batches on quarantine until QA releases them, record every data change with the old value, the person and the time, block unauthorised access, back up records, and be validated. An ERP that fits does this inside one batch flow. Test it with one real batch before you buy.
Since 1 January 2026, the revised Schedule M good manufacturing practice rules have applied in full to pharma plants of every size in India, after the extension for small and medium manufacturers ended. Gujarat, home to about a third of India's pharma production, has more of those plants than any other state, and many still run on Tally, Excel and paper batch records. This guide covers what the revised rules ask of software, what to test before buying an ERP, and when to extend what you have instead. We build ERP systems from Gujarat (our headquarters is in Nadiad) and our own Pharma UMS for plant IT access. We do not resell any ERP, and no software can make a plant compliant on its own.
Why pharma ERP in Gujarat is its own problem
The Gujarat government says the state makes about 30% of India's pharmaceutical production and 28% of its pharma exports, from over 4,000 manufacturing units. Most are small and medium formulation and API makers around Ahmedabad, Vadodara, Ankleshwar and Bharuch, and Vapi. A general manufacturing ERP handles purchase, stock and sales. A pharma plant also has to prove quality batch by batch to an inspector, and that is where general systems and spreadsheets break down.
Revised Schedule M in 2026: what changed and who it covers
The revised Schedule M was notified on 28 December 2023 (G.S.R. 922(E)). Large manufacturers, with turnover above ₹250 crore, had six months to comply, and small and medium manufacturers twelve. In February 2025, G.S.R. 127(E) gave small and medium manufacturers who applied in Form A with an upgrade plan until 31 December 2025. We have found no further extension, so every licensed unit should now expect inspection against the revised rules.
The revised rules open with a pharmaceutical quality system, quality risk management and product quality review, and add formal change control. They also contain a section on computerised systems (section 20 of Part I, and section 5.4 of the API part). That section is short, and nearly every line touches software:
| Schedule M requires | What the software must do |
|---|---|
| GMP-related computerised systems shall be validated (20.1) | Come with validation documents you can complete for your use, and stay in a validated state |
| Controls to prevent unauthorised access or changes to data (20.4) | Named logins, role-based rights, no shared accounts |
| A record of any data change, the previous entry, who made it and when (20.4) | An audit trail that cannot be switched off or edited |
| Controls to prevent omissions in data (20.4) | Mandatory fields and no silent gaps when a system is down |
| A second check on critical data entered manually (20.6) | Second-person or system verification on weights, results and yields |
| Changes made through a change procedure, authorised and tested (20.8) | Release notes and change records for every software update |
| A back-up system so no records are lost (20.9) | Tested backups and restore, on cloud or on-premise |
The API part adds that electronic signatures on documents must be authenticated and secure (6.1.9). Records must be retained for at least one year after the expiry date of the finished product (17.2.7), and any alteration must be signed and dated so the original can still be read (17.2.6).
QC status: stock that cannot ship what QA has not released
Schedule M requires incoming materials and finished products to be quarantined on receipt or processing until released (14.4), and finished products to stay in quarantine until final release (14.29). Container labels must show status: in quarantine, on test, released, rejected, returned or recalled. In a paper plant, those statuses live on labels and in registers while the stock system sees only quantities.
- Receive every material lot into quarantine automatically, with its supplier batch, manufacture and expiry dates.
- Let only QA move a lot to released or rejected, with an e-signature and a reason.
- Block dispensing of unreleased materials and dispatch of unreleased batches in the system itself, not by a note on the rack.
- Pick finished goods by first-expiry-first-out, and trace any dispatched batch back to its raw-material lots for a recall.
Batch records: paper BMR or electronic
Many small plants will keep paper batch manufacturing records for a while, and that is allowed: Schedule M permits data to be recorded by electronic or other reliable means. The cost of paper shows up in review time and transcription errors when the same weights and yields are copied into the stock system. A sensible order is to link the BMR number to the ERP batch first, record dispensing weights and yields in the system next, and move whole records to electronic form only when the process is stable and validated.
User access and e-signatures
Inspectors ask who can use which system, who approved that access, and when it was removed. Plants often keep this on paper forms per department, which fall apart at audit time. Our Pharma UMS replaces those forms with one portal: employees request system, SAP and instrument access, approvers sign off in the chain the plant sets, and every step is e-signed and kept in an append-only audit trail. It is a smaller first project than an ERP, and the access records it keeps are the same ones an ERP audit trail depends on.
Plants exporting to the US also face FDA expectations for electronic records. We cover that in software under 21 CFR Part 11 and audit trail software for batch release.
GST after the September 2025 rate cut
The GST Council's 56th meeting cut the rate on most drugs and medicines from 12% to 5%, exempted a list of life-saving drugs, and cut pharma job-work services from 12% to 5%. Where inputs such as APIs, solvents and packaging carry a higher rate than the finished product, input tax credit builds up. Claiming it back as an inverted-duty refund depends on clean, rate-wise records of inputs and outputs.
- Keep HSN codes and GST rates as dated data on the item master, so a rate change is one update, not a hunt through invoices.
- Report input tax credit by rate band each month, so the refund claim is prepared from the ledger, not rebuilt in Excel.
- Generate the e-invoice and e-way bill from the dispatch record, as we describe for chemical plants in our Gujarat chemical ERP guide.
- If you make any of the 300 brands listed under G.S.R. 823(E), batches made since 1 August 2023 must carry a QR code or barcode. Keep batch, expiry and the code together so labels and records match.
When Tally plus add-ons is enough
If your plant makes a small range of products, QA already runs well on paper, and accounts are clean in Tally, you may not need a new ERP. Batch-wise stock with expiry in Tally, plus a validated QC and quarantine layer and a proper access system, can cover what inspectors ask about software. The time to move is when the same batch is typed into three places, when a released status lives only on a rack label, or when nobody can say who has access to what.
| Approach | Fits when | Watch for |
|---|---|---|
| Pharma ERP package | Standard formulation or API flows that match the package | Validation documents and support for your version; cost of customising QA screens |
| Tally plus a custom QA and plant layer | Accounts run well in Tally; gaps are QC status, batches and access | Two systems to validate and keep in sync; agree which one owns stock |
| Custom ERP or modules | Unusual processes, or only a few modules needed | Build time, validation effort and upkeep. Start with QC status, batches and access, not every module |
We cover the general version of this choice in custom ERP or off-the-shelf, and stock control in custom inventory management software.
Run one real batch through any demo before you sign
- 1Receive a raw material lot and confirm it lands in quarantine.
- 2Enter QC results, release it with an e-signature, and try to dispense a lot that is still on test.
- 3Dispense against a batch, record weights with a second-person check, and record yield.
- 4Put the finished batch on hold, release it, and dispatch it by first expiry with the e-invoice and e-way bill.
- 5Change one recorded value and show the audit trail: old value, new value, who, when and why.
- 6Trace the dispatched batch back to its raw-material lots, and print every record an inspector would ask for.
If any step needs a spreadsheet, a paper register or a promise of a future customisation, you have found the real cost of that system.
Common questions
Is there still an extension for revised Schedule M?
The extension for small and medium manufacturers under G.S.R. 127(E) ran to 31 December 2025, and we have found no later one. Check CDSCO's notices for your own case.
Does revised Schedule M require an ERP?
No. It requires controls over materials, records and computerised systems. Paper is still allowed, but any computerised system used for GMP work must be validated, access-controlled, audit-trailed and backed up.
Can software make a pharma plant Schedule M compliant?
No. Compliance belongs to the licence holder and covers premises, people and processes. Software can enforce QC status, keep audit trails and remove double entry, which makes compliance easier to prove.